Eliminating Transmission & Interconnection Bottlenecks to Accelerate Power Delivery

  • Clarifying where generation, transmission and distribution each become bottlenecks for high density campuses, to support more accurate assumptions in load flow [MI1.1]
  • Examining how long transmission build out timelines and interconnection queues affect the energization of new data center campuses, to align medium voltage design work with achievable in service dates
  • Designing campus electrical systems to accommodate phased energization and future capacity to ensure reliability despite transmission/interconnection delays