Navigating the Shift from Design-Bid-Build to Design-Build for Faster, More Coordinated Delivery
- Aligning contract types and team structures with hyperscaler/colocator preferences to minimize silos
- Establishing collaborative workflows design-build teams to support decision making and reduce delays during fast paced project delivery
- Incorporating flexibility and risk mitigation to manage design revisions as requirements evolve more quickly